Project Details

Completion Date: April 2010

Client: Kern County Water Agency
Bakersfield, California

Kern County Water Agency, Bakersfield, CA
Contract # KCWA-2007-08
Project Overview
  • Construction of the Kern County Water Agency
  • Improvements to District No. 4 Henry C. Garnett Water Purification Plant Service Entrance
  • Approximate Contract Value – $13.5 million
​Scope of Service
  • Ryan was the prime contractor and electrical contractor
  • Preparation of site – site clearing, dust control, environmental protection, and perimeter fence
  • Construction of a new 115kV to 4160v substation and service entrance building
  • Installation of a  4.16 kV electrical power distribution system comprised of remotely operated medium voltage switchgear
  • 2000kw Stand-by diesel engine generators
  • Installation of an automatic transfer control system
  • Providing all electrical raceways, including concrete encased underground ductbanks, cable tray and conduit, and conductors required to connect the following existing facilities

Related Projects

2024
Shore Power Installation
San Diego, California

Shore Power Installation at NCMT Berths 24-10 and 11 at the National City Marine Terminal. Scope includes demolition, excavation, backfill, debris removal, installation of substation,...

View Project
August 2022
Sun Mountain 230kV Substation
Pueblo, Colorado

Construction of a new 230/34.5kV Substation Scope included initial site preparation, foundations, site fencing, station grounding, control and power conduit and cables, steel structures, HV...

View Project
September 2016
California State University
Fresno, CA

Project Overview Construction new 12 kV Switchgear Building including switchgear, cable vaults, incoming PG&E, manholes, interrupter switch, 12 kV loop feeder distribution control system and...

View Project
Copyright © 2025 The Ryan Company, Inc. All Rights Reserved.
Back to Top