Completion Date: 2024

Location: San Diego, California

Client: Port of San Diego
San Diego, California

Shore Power Installation
Port of San Diego, CA
Description of Project

Shore Power Installation at NCMT Berths 24-10 and 11 at the National City Marine Terminal.

Scope includes demolition, excavation, backfill, debris removal, installation of substation, shore power vault, shore power outlet, duct-banks, manholes, primary power service entrance, metering equipment, transformers, grounding, underground electrical cables, concrete pads, distribution switchgear, vaults, outlets, conduit, conductors, connections to system, structural work, and other ancillary items to provide complete and operational system including testing, start-up, & preventative maintenance.

Related Projects

August 2022
Sun Mountain 230kV Substation
Pueblo, Colorado

Construction of a new 230/34.5kV Substation Scope included initial site preparation, foundations, site fencing, station grounding, control and power conduit and cables, steel structures, HV...

View Project
September 2016
California State University
Fresno, CA

Project Overview Construction new 12 kV Switchgear Building including switchgear, cable vaults, incoming PG&E, manholes, interrupter switch, 12 kV loop feeder distribution control system and...

View Project
September 2018
Electrical Substation Replacement
San Francisco, California

The Project consists of furnishing labor and material necessary to remove the existing 12kV main electrical substation on the campus of San Francisco State University...

View Project