Home Projects

NextEra Energy
Washoe County, Nevada

See all Projects
Project Details

Completion Date: October 2021

Location: Washoe County, Nevada

Client: NextEra Energy
Juno Beach, Florida

Dodge Flat 345kV Substation
Washoe County, Nevada
Description of Project

Construction of a new 345/34.5kV Solar Substation and 345kV Gen-Tie Line.

Scope included initial site preparation, foundations, site fencing, station grounding, control and power conduit and cables, steel structures, HV and LV electrical equipment (transformer, breakers, switches, capacitors and disconnects) control building with SEL Relay Panels, rigid bus and jumper overhead system and all testing and commissioning services.

Related Projects

October 2023
Willowbrook 138kV Substation
Winchester, Ohio

Construction of a new 138/34.5kV Substation Scope included initial site preparation, foundations, site fencing, station grounding, control and power conduit and cables, steel structures, HV...

View Project
November 2022
Skeleton Creek 345kV Substation
Garfield County, Oklahoma

Construction of a new 345/34.5kV Substation Scope included initial site preparation, foundations, site fencing, station grounding, control and power conduit and cables, steel structures, HV...

View Project
August 2022
Bellflower 138kV Substation
W. Lewisville, Indiana

Construction of a new 138/34.5kV Substation Scope included initial site preparation, foundations, site fencing, station grounding, control and power conduit and cables, steel structures, HV...

View Project
Copyright © 2025 The Ryan Company, Inc. All Rights Reserved.
Back to Top