Construction of a new 100MW/400MWh Battery Energy Storage System and Retrofit of existing 345kV Substation.

Scope included 100MW BESS System with 93 battery container & 31 integrated invertors, initial site preparation, pile and concrete foundations, site fencing, grounding, MV/AC/DC conduit and cables, structures, electrical equipment (transformer, switchboard and fiber enclosure), retrofit of existing substation including addition of feeder bay, foundations, breakers, switches, rigid bus & jumper overhead system along with all testing and commissioning services.

Related Projects

2024
Inertia Energy Storage
Haskell County, Texas

Construction of a new 13MW/49.4MWh Battery Energy Storage System and Retrofit of existing 345kV Substation. Scope included 13MW BESS System with 24 battery container &...

View Project
2023
Storey BESS 88MW & Substation
Coolidge, Arizona

Construction of a new 88MW/302MWh Battery Energy Storage System, New 230/34.5kV Substation, Retrofit existing 230kV Substation and New 230kV Transmission Line. Scope included 88MW BESS...

View Project
February 2022
Fish Springs 345kV Substation & 25MW/100MWh BESS
Washoe, Nevada

Construction of a new 345KV Substation and 25MW/100MWh Battery Energy Storage. Scope included 345/34.5kV Substation, 345kV Gen-tie span, 25MW BESS System with 12 battery container...