Completion Date: November 2015

Location: Colebrook, Conneticut

Connecticut’s First Commercial Wind Farm
Project Overview
  • (2) General Electric 2.85- 103 turbines
  • 5KVA 240/120 Transformer
  • Completed in eight months
Scope of Services
  • Full engineering, procurement, and construction (EPC) of entire system
  • Provided and performed project engineering and design
  • Provided and installed civil and site work
  • Provided and installed erosion, sedimentation control and drainage
  • Provided and installed turbine foundations
  • Provided and installed electrical collection substation

Related Projects

2017
ConEdison Development 150MW Portfolio

The ConEdison Development Portfolio represents a combined 150MW at six different locations in the Central Valley of California. Some 1000 acres will have been converted...

View Project
September 2014
Norton Solar 3.46 MWDC Solar Project

Norton Solar is a 3.46 MWDC fixed ground-mount solar project. Located in Norton, Massachusetts. Ryan’s responsibilities comprised full procurement and construction of the entire system...

View Project
January 2013
Alpaugh & Alpaugh North: 92.6 MWDC

Project Overview ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers Completed in 9 months Trina 280W, 285W, & 290W; and Canadian Solar 280W...

View Project