Completion Date: September 2018
Location: San Francisco, California
Client: California State University
San Francisco, California
The Project consists of furnishing labor and material necessary to remove the existing 12kV main electrical substation on the campus of San Francisco State University in San Francisco, California, and to replace it with a new 12kV main electrical substation, including, but not limited to, performing all necessary site work at the substation site, including construction of concrete slabs, housekeeping pads, sidewalks, fencing and roof structure, sequencing construction and providing temporary power arrangements to maintain electrical service during construction, coordinating with PG&E for cutover of electric metering and service cables to new substation, replacing sections of 12kV feeder cables, replacing 12kV taped splices with modular separable connectors, providing grounding system additions in electrical manholes and modifying the campus power monitoring system and related systems.
Shore Power Installation at NCMT Berths 24-10 and 11 at the National City Marine Terminal. Scope includes demolition, excavation, backfill, debris removal, installation of substation,...
Construction of a new 230/34.5kV Substation Scope included initial site preparation, foundations, site fencing, station grounding, control and power conduit and cables, steel structures, HV...
Project Overview Construction new 12 kV Switchgear Building including switchgear, cable vaults, incoming PG&E, manholes, interrupter switch, 12 kV loop feeder distribution control system and...