Completion Date: September 2016
Location: Fresno, California
Client: California State University
Fresno, California
Construction new 12 kV Switchgear Building including switchgear, cable vaults, incoming PG&E, manholes, interrupter switch, 12 kV loop feeder distribution control system and campus power monitoring system.
Building incoming low voltage service feeders, switchboards and power meters. Includes connecting the power meters to the local building IDF for connection to the new campus power monitoring system. Underground PG&E infrastructure between Cedar and Chestnut Avenues located on the North side of Barstow Avenue as part of the PG&E Rule 20 design project to underground the existing overhead 12kV pole line as part of a street widening project to add a bicycle lane in the future.
The design includes equipment pads on grade for transformers and capacitors. Created and implemented traffic and pedestrian control plans. Work was performed with the campus remaining operational and active.
Shore Power Installation at NCMT Berths 24-10 and 11 at the National City Marine Terminal. Scope includes demolition, excavation, backfill, debris removal, installation of substation,...
Construction of a new 230/34.5kV Substation Scope included initial site preparation, foundations, site fencing, station grounding, control and power conduit and cables, steel structures, HV...
Project Overview Construction new 12 kV Switchgear Building including switchgear, cable vaults, incoming PG&E, manholes, interrupter switch, 12 kV loop feeder distribution control system and...