Project Details

Completion Date: December 2015

Client: City of Long Beach
Long Beach, California

Long Beach, CA
Owner: City of Long Beach
Project Overview
  • Construction of Shore-to Ship Power Project at Pier T, Berths T132-T140
  • Approximate Contract Value – $25 million
Scope of Service

The Work includes, but is not limited to, the following items:

  • Construction of 25 kV switchgear adjacent to existing switchgear at the
  • Main Terminal Substation (“MTS”).
  • Construction of Shore-to-Ship Power (“SSP”) Substations SSP 1, SSP2, SSP3 and SSP4.
  • Construction of Shore to Ship Power Outlets SPO-I, SPO-2, SPO-3, SPO-4, SPO-5, SPO-6, SPO-7, SPO-8, SPO-9, SPO-to, and SPO-ll, including wharf modifications for vaults.
  • Construction of equipment pads.
  • Earthwork, including excavation, bedding, filling, grading and segregate, test, reuse and dispose of excavated soil
  • Installation of crushed miscellaneous base and asphalt concrete pavement.
  • Demolition of existing paving, fencing and bollards.
  • Construction of paving, fencing and bollards, including footings.
  • Construction of duct banks, manholes and pull boxes.
  • Construction of conduit systems, including supports, under the existing
  • Construction of existing slurry and cut-off wall penetrations.
  • Installation of conductors in existing and new duct bank systems.
  • Installation and interconnections of new fiber optic cables for Power Logic
  • Communications between SSP substations, MTS switchgear and
  • Provide training for Power Logic software
  • Acceptance Testing
  • Shore to Ship Power System Commissioning.

Related Projects

2024
Shore Power Installation
San Diego, California

Shore Power Installation at NCMT Berths 24-10 and 11 at the National City Marine Terminal. Scope includes demolition, excavation, backfill, debris removal, installation of substation,...

View Project
August 2022
Sun Mountain 230kV Substation
Pueblo, Colorado

Construction of a new 230/34.5kV Substation Scope included initial site preparation, foundations, site fencing, station grounding, control and power conduit and cables, steel structures, HV...

View Project
September 2016
California State University
Fresno, CA

Project Overview Construction new 12 kV Switchgear Building including switchgear, cable vaults, incoming PG&E, manholes, interrupter switch, 12 kV loop feeder distribution control system and...

View Project
Copyright © 2025 The Ryan Company, Inc. All Rights Reserved.
Back to Top